Views
1 year ago

Northern Cape Investment Prospectus 2024

  • Text
  • Hydrogen
  • Transportation
  • Water
  • Solar
  • Energy
  • Renewable
  • Development
  • Ports
  • Business
  • Investment
  • Prospectus
  • Industrial
  • Kimberley
  • Upington
  • Mining
  • Economy
  • Economic
  • Province
  • Tourism
  • Northern
The 2024 Official Investment Prospectus for the Northern Cape Province of South Africa.

MAINTENANCE, REPAIR AND

MAINTENANCE, REPAIR AND OVERHAULING MRO planned for Upington Airport. Prieska De Aar Targeted sector Aeronautics Investment value The total value that is required for the project is R800-million. Job creation A total of 400 jobs will be created by this project. Project financed by The project will be financed by the private sector with the government providing enabling infrastructure. Project status The business case and feasibility studies have been completed. An investor has identified a need to develop an MRO in South Africa and the viable location for it is Upington due to its arid climate, long airport runaway (5km) and other factors. MRO stands for maintenance, repair and overhauling. The establishment of an Industrial Park in Upington is also a critical factor which could lead to the success of this project as it offers lucrative incentives and other enabling factors. The investor intends to develop an aviation park to accommodate maintenance, repairs and overhaul of aircraft and research and development. These activities will also include airline storage, dismantling, scrapping, painting and internal refurbishment. Partnerships The Northern Cape Economic Development, Trade and Investment Promotion Agency (NCEDA) is the project leader. Partnerships are envisaged with the private sector, provincial government, local government and state-owned enterprises. CONTACTS: UPINGTON Upington Industrial Park, NCEDA Contact person: Mr Hendrik Louw Tel: +27 87 086 0365 Mobile: +27 60 997 7222 Email: houw416@gmail.com

NAMAKWA IRRIGATION DEVELOPMENT PROJECT PROJECT DESCRIPTION The scope of this project will be to develop approximately 3 200ha of high-potential arable land in the Namakwa District. This arable land is located in 11 distinct areas. Each of these have been described, planned and costed individually. Onseepkans has been identified as the pilot to this larger project and the bulk water system is being constructed. Of the identified land, 2 000ha has existing water licences. A further 1 200ha will have to be secured. The basket of products to be produced varies from cash crops such as lucerne and grains, but the bulk of the development is aimed at high-value crops with export potential in order to secure significant growth on the required investment. This development (11 projects) will generate R521-million per annum in value of production when in full production. This will have an economic impact on various levels of the economy. It will lead to an increase in the Gross Domestic Product (GDP) of the Namakwa District. Additional value PROJECT LOCATION: will be added through inputs such as machinery and District: Namakwa District, 11 localities equipment, chemicals, packing material, fuel, electricity, water, etc. This NUMBER development OF JOBS would TO BE add CREATED: an additional R200-million The to the impact Namakwa on employment economy due on to a the direct proposed level. Adding the indirect and induced levels, the impact on GDP exceeds R272-million per annum for the entire economy. PARTNERSHIPS at the place of production. With the indirect and • Department of Agriculture, Land Reform and Rural Development (National) • Department of Agriculture, Land Reform and Rural INVESTMENT VALUE: Development (Provincial) The investment value of the 11 localities • IDC is around R1.7-billion. • Khai-Ma Local Municipality INVESTMENT VALUE The investment value across the 11 localities where this project will be located is around R1.7-billion. NUMBER OF JOBS TO BE CREATED The impact on employment due to the proposed development is estimated at 3 447 on a direct level, which will include 133 skilled and 1 772 semi-skilled positions. Most of this direct employment will be at the place of production. With the indirect and induced levels added, the impact on employment increases to more than 3 945 for the entire economy. INVESTMENT OPPORTUNITIES RESPONSIBLE INSTITUTION Northern Cape Department of Agriculture Contact person: Dr PS Kegakilwe, Chief Director Tel: 053 838 9110 | Mobile: 083 554 5583 Email: pkegakilwe@ncpg.gov.za and cc pkegakilwe@yahoo.com NAMAKWA IRRIGATION DEVELOPMENT PROJECT development is estimated at 3 447 on a direct level, which will include 133 skilled and 1 772 semi-skilled positions. Most of this direct employment will be induced levels added, the impact on employment increases to more than 3 945 for the entire economy Kleinzee Hondeklip Bay Vioolsdrift Springbok Namakwa District Brandvlei Upington Sutherland Kathu Kuruman Colesberg Kimberley

Other recent publications by Global Africa Network: